Tower Control
The runway is yours: take-off and landing clearances, runway separation, wake turbulence and the VFR circuit.
Tower (TWR) owns the runways and the control zone around the airport. Every take-off and landing happens with your clearance, and only one aircraft at a time may be cleared to use a runway. Tower is about timing: getting departures out in the gaps between arrivals, without ever putting two aircraft on the same piece of runway.
1. Choosing the runway
Aircraft take off and land into the wind. Choose the runway with a headwind or the smallest tailwind (usually up to 5 kt tailwind is acceptable), taking into account noise rules, the ILS and the airport's preferred runway. Tell Approach and Ground when you change it, and update the ATIS.
2. Departures
Pilot: "Queen Alia Tower, Levant two one eight, holding point runway two six right, ready for departure."
TWR: "Levant two one eight, wind two seven zero degrees one two knots, runway two six right, cleared for take-off."
- Line up and wait: "Levant two one eight, line up and wait runway two six right." Use it to save time while the runway is still being vacated – never keep an aircraft lined up long with traffic on final.
- Always give the wind before a take-off or landing clearance.
- After take-off, hand over to Departure/Approach as soon as the aircraft is airborne and clear of any conflict: "contact Amman Approach one two zero decimal one."
3. Arrivals
Pilot: "Queen Alia Tower, Levant two one eight, established ILS Z runway two six right."
TWR: "Levant two one eight, continue approach, number two, traffic Airbus three twenty on four mile final." … "Levant two one eight, wind two six zero degrees one zero knots, runway two six right, cleared to land."
Give the landing clearance when the runway will be free in time – normally by about 2 miles from touchdown. After landing: "vacate via Echo four, contact Ground one two one decimal niner."
4. Runway separation
An aircraft may not be cleared to land or take off until:
- a preceding departure has crossed the end of the runway or started a turn away;
- a preceding landing aircraft has vacated the runway.
Plan departures between arrivals: with arrivals 6 NM apart on final, a ready aircraft can usually take off after one lands and before the next is at 2 NM.
5. Wake turbulence
Every aircraft leaves wake vortices behind it, strongest behind heavy aircraft that are slow and clean. ICAO wake categories: Light (L) up to 7,000 kg, Medium (M) up to 136,000 kg, Heavy (H) above, and Super (J) for the A380.
| Departing behind | Minimum time |
|---|---|
| Medium or Light behind Heavy (same runway) | 2 minutes |
| Light behind Medium | 2 minutes |
| Heavy behind Super (A380) | 2 minutes |
| Medium or Light behind Super (A380) | 3 minutes |
| From an intersection behind Heavy (M or L) | 3 minutes |
Warn pilots: "caution wake turbulence, departing Boeing seven seven seven."
6. The VFR circuit
The circuit is a rectangle around the runway: upwind, crosswind, downwind, base and final, normally with left turns at 1,000 ft above the airport. Sequence VFR traffic with IFR arrivals: "Levant two zero five, number two, follow the Cessna on base." Give traffic information so VFR pilots can see each other.
7. Go-arounds and the unexpected
- If the runway is not clear: "Levant two one eight, go around, I say again, go around, runway occupied." Then give the missed approach or a heading and altitude, and tell Approach.
- A pilot may also go around on their own – acknowledge, separate them from departures and coordinate.
- Light signals are the backup when radio fails (see PPL Air Law): steady green = cleared to land/take off, steady red = give way / stop, flashing red = do not land / clear the runway.
Controlling it at Levant
On a Levant group flight, decide early the order of departures and leave gaps for arrivals. A strong Tower controller keeps the runway busy without hurrying anyone, and says "cleared to land" only when sure the runway will be free.
Check yourself
- A Medium departs behind a Heavy from the same runway. Minimum time? 2 minutes.
- When may the next landing aircraft be cleared to land after a landing? When the preceding aircraft has vacated the runway (or will have in time).
- What do you give with every take-off or landing clearance? The wind and the runway.
- The runway is blocked and an aircraft is on 1 NM final. What do you say? "(Callsign), go around, I say again, go around, runway occupied."
Simulation training material based on ICAO PANS-ATM (Doc 4444). Wake turbulence values are the ICAO standard; some states use RECAT. Frequencies and taxiways are examples.