APP - Approach Control

Arrivals, Vectoring & Sequencing

STARs, radar vectors, speed control and holding: building a safe, efficient line of arrivals.

Lesson 4 of 5 4 min read 8 sections Updated Nov 9, 2026

Arrivals are the hardest and most rewarding part of approach control. Aircraft come from every direction, at different speeds, and all want the same runway. Your job is to turn that crowd into a single, evenly spaced line on final – the sequence – using routes, headings, speeds and, when needed, holding.

1. Standard Terminal Arrival Routes (STARs)

A STAR links the en-route network to the approach. It ends at an initial approach fix (IAF) or at a point where vectoring begins. Centre usually hands arrivals over on their STAR, descending to an agreed level (for example FL160 at the boundary). From there you descend them and plan their position in the sequence.

Example at Queen Alia (OJAI): "Levant two one eight, cleared MUNRA one golf arrival, expect ILS Z approach runway two six right, descend to one zero tousand feet, QNH one zero one three." The STAR takes the aircraft towards the approach; from its end you vector or clear it for the ILS. 10,000 ft is below Jordan's transition level (FL150), so it is given as an altitude, with the QNH.

2. Planning the sequence

  • As soon as arrivals appear, decide the order: normally first come, first served by estimated time at the runway, adjusted for speed and wake category.
  • Decide the spacing you want on final: e.g. 5 NM between Mediums, 6 NM behind a Heavy for a Light, plus extra if departures need gaps.
  • Write the order on your strips or labels, and tell pilots their position: "Levant two one eight, number three for landing."

3. Vectoring to final

The classic radar pattern is a rectangle like a big circuit: downwind, base and the intercept heading onto final.

  • Downwind: parallel to the runway, opposite direction, around 8–10 NM abeam.
  • Base: a turn of 90° towards the final approach course.
  • Intercept: a heading that meets the localiser at an angle of 30° or less, at least 2 NM before the final approach fix and at an altitude below the glide path.

"Levant two one eight, turn left heading two nine zero, descend four tousand feet, QNH one zero one three." … "Turn left heading two eight zero, cleared ILS Z approach runway two six right, report established."

Use the downwind length as your adjustment ("the trombone"): extend it to make room, turn base early to close a gap.

4. Speed control for spacing

Give the whole sequence the same speed on the same leg; spacing stays constant only when everyone flies the same speed. Common plan: 250 kt below 10,000 ft, 220 kt downwind, 180 kt base and intercept, 160 kt to 4 NM final. Slow the leader before the follower, never the other way round.

5. Holding

When the sequence is full, send arrivals to a holding pattern – a racetrack over a fix, normally with right turns and 1-minute legs up to 14,000 ft (1.5 minutes above).

"Levant two one eight, hold at ALPHA as published, maintain flight level one six zero, expect further clearance at one five."

  • Stack aircraft 1,000 ft apart; the lowest leaves first.
  • Always give an expected approach time or "expect further clearance" time, so pilots can plan fuel.

6. Descent planning

A jet needs roughly 3 NM per 1,000 ft to descend comfortably. An aircraft at 12,000 ft, 30 NM from touchdown, needs about 36 NM to get down – give it a longer route or descend it earlier. Don't keep aircraft high and then ask for a steep descent and slow speed at the same time.

Controlling it at Levant

In a Levant group flight arriving at Beirut (OLBA), aircraft come in from the south-east over Jordan and Syria and from the sea to the west. Merge them into one stream early, keep the same speeds, and use holding over the published fixes rather than vectoring everyone in circles.

Check yourself

  1. Maximum intercept angle for the localiser? 30°, established at least 2 NM before the FAF.
  2. How do you open a 3 NM gap in the sequence? Extend the downwind / delay the base turn, or reduce the follower's speed earlier.
  3. What must every holding clearance include for the pilot's fuel planning? An expected approach time / expect further clearance time.
  4. An aircraft is at 10,000 ft, 20 NM from touchdown. Can it get down on a straight route? About 30 NM needed – give it more track miles.

Simulation training material. LOSAR 1C (SID), MUNRA 1G (STAR) and the ILS Z runway 26R are real Queen Alia (OJAI) procedures; frequencies, other fixes and levels are examples. Always use the current charts and IVAO division procedures.